Save this Search
     
Sort by:
  • Posted Date
Engineering & Manufacturing
Hourly Rate: $10 - $15 / hr   |  Duration: 7-9 months  |  Posted: Jul 25, 2015  |  Ends: 21d, 13h  |   10 Proposals
An Australian leading metalwork (Ornamental Steel) company requires a Quantity Surveyor / Estimator with proven experience in trade take-offs and estimating. - Business is in the largest 10% for size and turnover in Australia in the metalwork industry. - Well established business with good systems in place. - Diversity of work. We have a position available for a qualified Quantity Surveyor to join the management team of a leading Australian metal fabrication company. The company specialises in detailed metal fabrication on large scale construction sites throughout Australia. The type of work includes: - Handrails; - Balustrade; - Architectural screens; - Perforated metal products; - Feature architectural products; - Steel structures; - Sunscreens; - Gates and similar items. We require a qualified Quantity Surveyor with proven estimating background in architectural metalwork and steel. You should have: - Minimum of 10 years experience in architectural metalwork or similar e...
Category: Other - Engineering &...       

T****cts
 [?]
Sign in to view client's details.
| T****cts
|    Australia
Fixed Price: $30 - $60   |  Posted: Jul 20, 2015  |  Ends: 2d, 1h  |   7 Proposals
Create in excel a Cyclon Dust Collector Calculator. Calculator must be very simple to use. Each variable must be explained with notes and formulas. Delivery format must be accordingly to the example attached, password staff . Calculator must be in english, current example is in spanish. Calculator must be able to calculate at least 3 dust collector in a row. Example of some calculators (Some dont work properly)   [obscured]  /phpcyclone/cyclone_equation_radial_velocity.php   [obscured]  /doi/pdf/10.1080/00022470.1963.10468222 Input Variables: Material Type (Must create a drop menu with all the material types available for cyclones, like wood dust, sand dust, metal dust, etc.) Total Material per hour/day in Kg or lbs Material Size: mm Output: Material Speed Recomendation to Transport in Duct Cyclone size (Height, Inlet Speed, Outlet Speed, Width, Cone Length, CFM, and all data available to manufacture the cyclone) Material to construct cyclone recomended Gaug...
Category: Mechanical       

t****lio
 [?]
Sign in to view client's details.
| t****lio
|    United States
Symbol Key
Payment method not yet verified
Payment verified
Purchased $1-$500
Purchased $500-$5,000
Purchased more than $5,000
You have already submitted a
proposal to this job